Sea Prince — Kapal cepat — Perairan Ningsa Pura
- Nomor investigasi
- KNKT.15.11.08.03
- Waktu kejadian
- Lokasi
- Perairan Ningsa Pura
- Wilayah administratif
- KEPULAUAN RIAU
Kronologi & deskripsi kejadian
Grounding of Indonesian passenger ferry Sea Prince at Nongsa Channel, Riau Islands
Data teknis
| Nama kapal | Sea Prince |
|---|---|
| Tipe kapal | Kapal cepat |
| Nama perairan | Selat Singapura |
| Tipe area | Laut |
| Kelas klasifikasi | SMC |
| Keterangan klasifikasi | Heavy Damage |
| Alasan investigasi | Masuk kriteria investigasi |
| Koordinat | 1.205266667, 104.09195 |
| Sumber laporan | Investigasi KNKT |
Faktor penyebab & kontributor
- Faktor I
- Human Factor
- Faktor II
- Human Factor
- Faktor III
- Human Factor
Sarana & operator terkait
| Nama Kapal | Tipe Kapal | Imo Number | Gt | Operator |
|---|---|---|---|---|
| Sea Prince | Kapal cepat | 8883408 | 101 | Batam Fast Pte. Ltd. |
Rekomendasi keselamatan yang diterbitkan
Penerima: Kantor Pelabuhan Laut BatamAdministrator Pelabuhan
- 466OPEN0 tanggapan
1. Availability of an updated chart for approach to Nongsa port.
Lihat butir & lini masa tanggapan - 467OPEN0 tanggapan
2. Markings of Nongsa demarcated channel to be appropriate for transit during hours of daylight, darkness and/or restricted visibility.
Lihat butir & lini masa tanggapan - 468OPEN0 tanggapan
3. The standard of inspection carried out by Liferaft Service Provider to comply with guidelines provided by IMO Resolution A.761 (18) for different ages of the liferaft.
Lihat butir & lini masa tanggapan - 469OPEN0 tanggapan
4. The installation of ECDIS onboard ferries on international voyages.
Lihat butir & lini masa tanggapan - 470OPEN0 tanggapan
5. Reporting of the maritime incident as required by Ferry Mishap Contingency Plan (FMCP)
Lihat butir & lini masa tanggapan
Penerima: PT Batam FastOperator Kapal
- 471CLOSED2 tanggapan
1. Updated Sea Prince salient feature, in particular, on the aft draught markings, to include about 0.65 m (propeller and rudder drop below the baseline), to be posted on the bridge.
Lihat butir & lini masa tanggapan - 472CLOSED2 tanggapan
2. Review of Safety Management Manual, in particular, to include: ▪ When vessel is in distress, the distress signals and messages to be activated. ▪ Situational condition and updates for passengers to be announced through the onboard public-address system accordingly.
Lihat butir & lini masa tanggapan