Lompat ke konten utama
Lambang KNKTKNKT
PenerbanganFinal ReportAccident

Airbus A330-243 A6-EYN — Near Palembang

Nomor investigasi
KNKT.16.05.13.04
Waktu kejadian
Lokasi
Near Palembang
Wilayah administratif
KOTA PALEMBANG, SUMATERA SELATAN

Kronologi & deskripsi kejadian

At approximately 15 minutes before TOD to Jakarta (CGK), the flight experienced severe turbulence and caused passengers and flight attendants suffered serious injuries

Data teknis

Data teknis kejadian Airbus A330-243 A6-EYN — Near Palembang
Operator / maskapaiEtihad Airways
RegistrasiA6-EYN
Tipe pesawatAirbus A330-243
MTOWabove 5,700 kg
Tipe operasiOther
Fase penerbanganENR
Jenis kejadianTurbulence Encounter
TeritoriSUMATERA

Korban

Luka berat7orang

Faktor penyebab & kontributor

Faktor penyebab belum tercatat pada basis data untuk kejadian ini.

Sarana & operator terkait

Daftar sarana dan operator yang terlibat
OperatorFlight NumberRegistrasiTipe PesawatMtowTahun PembuatanTipe Operasi
Etihad Airways—A6-EYNAirbus A330-243above 5,700 kg—Other

Rekomendasi keselamatan yang diterbitkan

Penerima: Directorate General of Civil Aviation

  • 04-R-2016-13.3OPEN0 tanggapan

    KNKT recommends the DGCA to enforce the Indonesia aircraft operators to review the effectiveness of the use of seatbelt policies to ensure passenger fastened their seatbelt when seated.

    Lihat butir & lini masa tanggapan

Penerima: Etihad Airways

  • 04-O-2016-13.1OPEN0 tanggapan

    The KNKT recommends the Etihad Airways to review the effectiveness of the use of seatbelt policies to ensure passenger fastened their seatbelt when seated.

    Lihat butir & lini masa tanggapan
  • 04-O-2016-13.2OPEN0 tanggapan

    The KNKT recommends the Etihad Airways to ensure pilot conducts NITS briefing after abnormal flight event as described in the Safety Emergency

    Lihat butir & lini masa tanggapan

Penerima: Etihad Airways

  • 04-O-2016-58.2CLOSED1 tanggapan

    To enhance the safety reminder for passenger to fasten the seatbelt while seating even though the seatbelt sign is off.

    Lihat butir & lini masa tanggapan
  • 04-O-2016-59.1CLOSED1 tanggapan

    To ensure the pilot implementation of the Operations Manual Part-A chapter 12, subchapter 12.12.1 regarding declaration of urgency message.

    Lihat butir & lini masa tanggapan