Boeing 737-300 PK-CKL — Juanda International Airport, Surabaya

Nomor investigasi
KNKT.14.01.02.04
Waktu kejadian
Lokasi
Juanda International Airport, Surabaya
Wilayah administratif
SIDOARJO, JAWA TIMUR

Kronologi & deskripsi kejadian

On final approach to SUB on RW 28, PIC as PM realize that aircraft on short final was not align with runway rather on parallel taxi way. ATC remind PIC to go around, but aircraft continue to land on parallel taxi way

Data teknis

Data teknis kejadian Boeing 737-300 PK-CKL — Juanda International Airport, Surabaya
Operator / maskapaiSriwijaya Air
RegistrasiPK-CKL
Tipe pesawatBoeing 737-300
MTOWabove 5,700 kg
Tipe operasiAOC 121
Fase penerbanganLanding (LDG)
Jenis kejadianNavigation Errors
Jenis kejadian IILanding on taxiway
Dimensi runway3000 x 45
Kode / nomor runwayCode 4

Faktor penyebab & kontributor

Faktor I
Environment; Human; Human

Sarana & operator terkait

Daftar sarana dan operator yang terlibat
OperatorFlight NumberRegistrasiTipe PesawatMtowTahun PembuatanTipe Operasi
Sriwijaya Air—PK-CKLBoeing 737-300above 5,700 kg—AOC 121

Rekomendasi keselamatan yang diterbitkan

Penerima: AirNav Indonesia Branch Office Surabaya

Penerima: Angkasa Pura I Branch Office Juanda International Airport

  • —CLOSED0 tanggapan

    The Aerodrome Manual Sub chapter 5.43 Hazard identification and risk assesment was not in accordance to CASR SMS subpart 7. As such, KNKT recommends that: To ensure that Aerodrome Manual Sub chapter 5.43 should refer to the detail contain of CASR SMS subpart 7.

    Lihat butir & lini masa tanggapan
  • —CLOSED0 tanggapan

    The investigation found that the runway centre lines marks blurred, covered by the rubber deposit KNKT recommends reviewing the current of rubber deposit removal schedule to ensure that the centerline marks appear clearly.

    Lihat butir & lini masa tanggapan
  • —CLOSED0 tanggapan

    The SMS implementation should refer to CASR SMS especially for the Safety Risk management

    Lihat butir & lini masa tanggapan

Penerima: Directorate General of Civil Aviation

  • —OPEN0 tanggapan

    Refer to the ICAO Annex 19 sub chapter 7, the DGCA shall implement documented surveillance processes, by defining and planning inspections, audits, and monitoring activities on a continuous basis. Therefore the KNKT recommends proactively assure the oversight and ensure that the recommendations issued in this final report were implemented correctly.

    Lihat butir & lini masa tanggapan

Penerima: Sriwijaya Air

  • —CLOSED0 tanggapan

    To review the modification of the current SOP, to include information for the pilot the requirement for go around whenever uncertain condition occurs at critical phase.

    Lihat butir & lini masa tanggapan
  • —CLOSED0 tanggapan

    To review the pilot CRM recurrent training on the subject of Visual Illusion in combining with decision making process in a critical situation included examples and practices

    Lihat butir & lini masa tanggapan
  • —CLOSED0 tanggapan

    To ensure that the pilot familiar to the current NOTAM and shall be included in the dispatch briefing

    Lihat butir & lini masa tanggapan