04.O-2018-25.01
- Instansi penerima
- Wings Air
- Kategori penerima
- Operator Pesawat
- Tanggal terbit
- 30 Juli 2018
- Batas waktu tanggapan
- 28 Oktober 2018
Isi rekomendasi
The flight was the first flight for the PIC and SIC to Tebelian Airport and there was no briefing related to the operation of new airport, therefore KNKT recommends to ensure the pilot provide with the current information before conducting flight.
Lini masa tanggapan instansi 1
-
Tanggapan 1 dari 1
Short Term :On June 25, 2018 - SSQ published Safety Notice 008 Date 25/06/2018 Landing or Attepted Landing on a closed runway or taxi wayOn June 28, 2018 - Operation Wings Air published Notice to All Crews, NTA/001/VI/2018 Upstream Defenses to prevent landing or Attepted Landing on a Closed Runway or Taxi Way.On June 22, 2018 – Flight Standard input AVG Tebelian, Sintang on File Management SystemLong Term :On August 3, 2018 – Operation made Training Review Board (CRM), modules review of serious incident Sintang - (Done)On August 15, 2018 – Evaluation for Material CRM between Training Departement Wings Air and ATC (Angkasa Training Centre) – (Done)On August 24, 2018 – First Joint CRM Training will running – (Plan)