Lompat ke konten utama
KNKT
Penerbangan OPEN Aturan

04.O-2022-07.02

Instansi penerima
Susi Air
Kategori penerima
Operator Pesawat
Tanggal terbit
26 Agustus 2022
Batas waktu tanggapan
24 November 2022 Terlampaui

Isi rekomendasi

According to the Susi Air Operations Manual Part A (OM-A), before conducting flight operations on any route or to any airport, a thorough analysis must be completed and DGCA approval must be obtained. The investigation had not received any document indicating that prior to starting the flight operation to Duma, the thorough analysis for the flight operation had not been conducted.The absence of thorough analysis of Duma flight was not in accordance with the OM-A and the hazards of the flight operation might not be unable to be identified and mitigated.Therefore, KNKT recommends the Susi Air to implement the thorough analysis prior to starting operations on any route or to any aerodrome in accordance with the OM-A.

Lini masa tanggapan instansi 1

  1. Tanggapan 1 dari 1

    Susi Air has implemented the Runway and Enroute Conditions Assessment Matrix (RECAM) procedure, which is a systematic approach to evaluate the present conditions of runways that are already being used but have suffered a deterioration in the safety conditions and new runways. The procedure requires pilot to complete a form and submitted to the safety department. The submitted form then will be assessed and mitigated by the safety department.In June 2023, Susi Air also issued a safety notice to ensure widespread awareness of the RECAM procedure among all Susi Air personnel.