Lompat ke konten utama
KNKT
Penerbangan Final Report A

Cessna 152 PK-KFC (Flybest Flight Academy) — Swallow Sea about 10 Nm from Batam

Nomor investigasi
KNKT.13.09.24.04
Waktu kejadian
Lokasi
Swallow Sea about 10 Nm from Batam
Wilayah administratif
KOTA BATAM, KEPULAUAN RIAU

Kronologi & deskripsi kejadian

During a route training flight, Cessna 152 PK-KFC aircraft declare an emergency due to engine problem. The aircraft ditched to seea and rescue by local fisherman. Nil injured. The aircraft was damaged

Data teknis

Data teknis kejadian Cessna 152 PK-KFC (Flybest Flight Academy) — Swallow Sea about 10 Nm from Batam
Operator / maskapai
Registrasi
Tipe pesawat
Nomor penerbangan
MTOW
Tahun pembuatan
Tipe operasi
Fase penerbangan En Route (ENR)
Tipe pendekatan
Jenis kejadian System/Component Failure or Malfunction (Powerplant)
Jenis kejadian II ditching
Teritori
Dimensi runway
Kode / nomor runway
Kondisi runway
Separasi horizontal
Separasi vertikal
Koordinat
Sumber laporan

Korban

0 Meninggal orang
0 Luka berat orang

Faktor penyebab & kontributor

  • Technical; Human; Human

Sarana & operator terkait

Daftar sarana dan operator yang terlibat
Operator Flight Number Registrasi Tipe Pesawat Mtow Tahun Pembuatan Tipe Operasi File Final Report
Flybest Flight Academy PK-KFC Cessna 152 below 2,250 kg PSC 141

Rekomendasi keselamatan yang diterbitkan

Penerima: Directorate General of Civil Aviation

  • OPEN 0 tanggapan

    To provide guidance related to the use of MOGAS for light aircraft operation to consider the weather phenomenon and other issues in Indonesia as required by CASR Part 43.13

    Lihat butir & lini masa tanggapan
  • OPEN 0 tanggapan

    To ensure KNKT recommendations to PT. Aviasi Solusi Prima (FlyBest Flight Academy) are well implemented

    Lihat butir & lini masa tanggapan

Penerima: FlyBest Flight Academy

  • OPEN 0 tanggapan

    To resolve discrepancy within the management in order to eliminate hazard that may exist.

    Lihat butir & lini masa tanggapan
  • OPEN 0 tanggapan

    To ensure safety risk assessment is performed and approval from the authority when required, to any alteration or policy differ from manufacturer procedures

    Lihat butir & lini masa tanggapan