Lompat ke konten utama
KNKT
Penerbangan Final Report SI

Cessna Grand Caravan 208B PK-BVE (Susi Air) — Bandar Udara Yuvai Semaring

Nomor investigasi
KNKT.22.5.02.04
Waktu kejadian
Lokasi
Bandar Udara Yuvai Semaring
Wilayah administratif
MALINAU, KALIMANTAN UTARA

Kronologi & deskripsi kejadian

During a turn to the right aiming to park the aircraft, the left-wing leading edge impacted apron floodlighting pole. The left-wing leading edge was found dent

Data teknis

Data teknis kejadian Cessna Grand Caravan 208B PK-BVE (Susi Air) — Bandar Udara Yuvai Semaring
Operator / maskapai
Registrasi
Tipe pesawat
Nomor penerbangan
MTOW
Tahun pembuatan
Tipe operasi
Fase penerbangan TX
Tipe pendekatan
Jenis kejadian Ground Collision
Jenis kejadian II
Teritori KALIMANTAN
Dimensi runway
Kode / nomor runway
Kondisi runway
Separasi horizontal
Separasi vertikal
Koordinat
Sumber laporan

Korban

0 Meninggal orang
0 Luka berat orang

Faktor penyebab & kontributor

  • H
  • T

Sarana & operator terkait

Daftar sarana dan operator yang terlibat
Operator Flight Number Registrasi Tipe Pesawat Mtow Tahun Pembuatan Tipe Operasi File Final Report
Susi Air PK-BVE PK-BVE Cessna Grand Caravan 208B 2,250 to 5,700 kg AOC 135

Rekomendasi keselamatan yang diterbitkan

Penerima: Directorate General Civil Aviation Regulator Indonesia

  • 04.R-2022-03.05 OPEN 0 tanggapan

    The oversight checklist described in Staff Instruction (SI) 139-01 did not include an item to verify if the airport operator had procedures in place to identify obstacles in Area 3. This omission led to the airport operator lacking a procedure to identify and measure obstacles in Area 3. In addition, the DGCA inspector’s methodology to ensure the availability of data/information that must be repor...

    Lihat butir & lini masa tanggapan
  • 04.R-2022-03.06 OPEN 0 tanggapan

    The DGCA oversight activities for Yuvai Semaring Airport identified the absence of taxiway centerlines and apron markings. This finding was classified as non-compliance which had to be rectified within two months. Until the day of the occurrence (three months later), the investigation did not find any follow-up action taken by the airport operator nor a reminder from the DGCA regarding this issue....

    Lihat butir & lini masa tanggapan

Penerima: Yuvai Semaring Airport Operator Operator Bandar Udara

  • 04.B-2022-18.01 OPEN 0 tanggapan

    The Aerodrome Reference Point (ARP) mentioned in the Aeronautical Information Publication (AIP) Volume III chapter WAQJ AD 2 - 1 was in accordance with the airport certificate issued by the DGCA in 2016. The coordinate location was located about 1 Nm southeast direction of the actual airport location. Considering that the ARP mentioned in the AIP would be use as reference for pilot, the incorrect...

    Lihat butir & lini masa tanggapan
  • 04.B-2022-18.02 OPEN 0 tanggapan

    Manual of Standard CASR Part 139 Volume I (MOS 139) subchapter 5.2.8 requires paved taxiway and apron to be provided by taxiway center line marking in such a way as to provide continuous guidance between the runway center line and aircraft stands. The airport has paved apron without taxiway centerline marking that can be used as guidance between runway centerline and aircraft stands. The absence o...

    Lihat butir & lini masa tanggapan
  • 04.B-2022-18.03 OPEN 0 tanggapan

    The CASR Part 175 subpart 175.210 described Area 3 as the area bordering an aerodrome movement area that extends horizontally from the edge of a runway to 90 meters from the runway center line, and 50 meters from the edge of all other parts of the aerodrome movement area including the apron or taxiway. The terrain and obstacles in the Area 3 which extends a half-meter (0.5 m) above the horizontal...

    Lihat butir & lini masa tanggapan

Penerima: Yuvai Semaring Airport Operator Operator Bandar Udara

  • 04.B-2022-03.04 OPEN 0 tanggapan

    The DGCA oversight activities for Yuvai Semaring Airport identified the absence of taxiway centerlines and apron markings. This finding was classified as non-compliance which had to be rectified within two months. Until the day of the occurrence, three months later, the investigation found that the airport operator had not taken any follow-up action to address the issue. Absence of follow-up actio...

    Lihat butir & lini masa tanggapan