Lompat ke konten utama
Lambang KNKTKNKT

Rekomendasi keselamatan Penerbangan

Setiap investigasi KNKT dapat menghasilkan butir rekomendasi yang ditujukan kepada regulator, operator, atau instansi lain. Buka satu butir untuk melihat lini masa tanggapan instansi penerimanya.

Moda

Butir rekomendasi keselamatan — 770 data, halaman 13 dari 39.
NomorModaInstansi penerimaIsi rekomendasiTerbitStatusTanggapan
04-O-2016-9.1PenerbanganGlobal Aviation Flying SchoolTo introduce the student pilots with Approach and Landing Accident Reduction (ALAR) training and stabilize approach criteria and to emphasized a go around shall be made when does n...CLOSED1
04-R-2016-21.3PenerbanganDirectorate General of Civil AviationTo ensure all instructors have adequate knowledge to the aircraft system.OPEN0
04-A-2017-7.7PenerbanganAirNav Indonesia District Office Halim PerdanakusumaIt is recommended updating the SOP to accommodate controller coordination to warrant the safe operation of aircraft and vehicle movement on maneuvering area.CLOSED1
04-A-2017-7.8PenerbanganAirNav Indonesia District Office Halim PerdanakusumaIt is recommended to ensure the taxi or towing clearance issued contains explicit limit to cross or to hold short of runway as required by AC 170.CLOSED1
04-A-2017-7.9PenerbanganAirNav Indonesia District Office Halim PerdanakusumaIt is recommended to reinforce the implementation of the KNKT recommendation (04.B-2016-57.1) which is to inform aircraft operators to initiate takeoff from the threshold runway 2...CLOSED1
04-B-2017-7.9PenerbanganAngkasa Pura II Branch Office Halim Perdanakusuma International AirportIt is recommended to reinforce the implementation of the KNKT recommendation (04.B-2016-57.1) which is to inform aircraft operators to initiate takeoff from the threshold runway 2...CLOSED1
04-L-2017-7.5PenerbanganJasa Angkasa SemestaIt is recommended to review the requirement of personnel licensing for towing car driver as required by the regulation standard, including the language requirement.CLOSED1
04-L-2017-7.6PenerbanganJasa Angkasa SemestaIt is recommended to ensure the SOP of towing procedure is well implemented.OPEN1
04-O-2017-7.1PenerbanganBatik AirIt is recommended that the operator enhances the FCTM chapter 3.24 Rejected Takeoff Decision which is the PIC should announce the abnormality simultaneously.CLOSED1
04-O-2017-7.2PenerbanganBatik AirIt is recommended that the operator to review the evacuation procedure and consider the area can be observed through the viewing windows.CLOSED1
04-O-2017-7.3PenerbanganTransNusa Aviation MandiriEnsure the aircraft adequately lighted during night operation in accordance with CASR 91.209.CLOSED0
04-O-2017-7.4PenerbanganTransNusa Aviation MandiriConsider risk assessment, compliance to the regulation and specification required prior to issue the Engineering Instruction.CLOSED0
04-R-2017-7.10PenerbanganDirectorate General of Civil AviationIt is recommended to review the procedure of aircraft movement on maneuvering area for airport operator and air navigation provider to accommodate the requirement of CASR 91.209. T...CLOSED1
04-R-2017-7.11PenerbanganDirectorate General of Civil AviationIt is recommended to review the requirement of personnel licensing for towing car driver as required by the ICAO standard.CLOSED1
04-R-2017-7.12PenerbanganDirectorate General of Civil AviationThe CASR 170 Air Traffic Rules subpart 170.039 point (4) mentions the statement “subject to the provisions in 3.8.3” that referred to chapter of ICAO Annex 11.It is recommended to...CLOSED1
04-R-2017-7.13PenerbanganDirectorate General of Civil AviationHalim has runway length of 3,000 meters and was displaced 200 meters. However, the published Aeronautical Information Publication (AIP) Volume I Amendment 28, did not contain infor...CLOSED1
04-B-2017-6.1PenerbanganAngkasa Pura I Branch Office Adisutjipto International AirportKNKT recommends ensuring that the runway centerline marking is clearly visible during aircraft operation.CLOSED1
04-B-2017-6.2PenerbanganAngkasa Pura I Branch Office Adisutjipto International Airportreviewing and or amending the inspection schedule to ensure the implementation is consistent with such manuals,CLOSED1
PenerbanganPelita Air ServicesTo establish monitoring system in order to monitor the implementation of the procedure for stabilized approach.CLOSED0
04-O-2017-5.1PenerbanganLion AirThe deteriorating weather condition and difficulty of the SIC to control the aircraft did not trigger a firm decision, therefore KNKT recommends to review pilot training program in...OPEN1